Sindh Provincial Energy Minister Syed Nasir Hussain Shah visited Dow medical Hospital (Ojha Campus) and Sindh Government Hospital Liaquatabad to inspect the solar system. On this occasion MD, Tharkol Energy Board Tariq Ali Shah, Director Solar Energy Mahfouz Qazi were also with him.
2310 kw has been installed in Dao Medical Center, 245.16 kw in Sindh Government Hospital Liaquatabad, the construction cost of which has been 1.3 million dollars.
This project will save 187.11 million rupees annually and the project will be operational for 25 years.
Nasir Shah said that a solar system of 245.16kw has been installed in Sindh Government Hospital Liaquatabad, this system will save 26.7 million rupees annually.
He said that last year 594092.81 units were obtained from this system. Minister Nasir Shah said that according to the vision of Chairman Bilawal Bhutto, public welfare projects are ongoing in the entire province, providing electricity to government buildings through solarization will also reduce the burden of the government, while the construction of solar parks is the vision of the chairman.
According to this, it will be possible to provide cheap electricity.