KARACHI,On the instructions of Director General Sindh Building Control Authority, Abdul Rasheed Solangi, the campaign against illegal construction is going on in full swing.
In the ongoing demolition campaign, additional floors, portions and other illegal constructions including violations of land use were demolished and sealed in different districts of the city.
In the light of the orders of the Director General SBCA, on special instructions of the Demolition Squad is continuing the demolition operations seven days a week without any holiday and so far demolition and other legal actions have been taken against more than 150 illegal constructions across the city.
Apart from this, on the instructions of Director General Abdul Rashid Solangi, the action of the Demolition Squad is ongoing. No. 223, B Area, front RCC structure demolished from ground to 2nd floor, while on Plot No. 11, Firdous CHS, front RCC structure demolished from ground to 3rd floor, further demolition process Continued. Plot No. 7/2, Sub-Block 1-E, RCC roof of Pratisri Manzil in Nazimabad area of District Central in compliance with a court order Plot No. C-141, Block C in the North Nazimabad area, On the second floor, the walls of the illegal flat were demolished, while the further demolition process was postponed due to the deteriorating law and order situation. In addition, Plot No. D-10, Block 13-D-1, in the Gulshan Iqbal area of District East.
But in the action against the illegal marriage hall, the booking office, room, stage and kitchen walls along with the RC roof were demolished and the illegal construction of the second floor on Plot No. 17/54, Block 03, Farhan CHS was sealed while the plot in Garden West No. 438/1, GW, 17th-floor partition walls and RCC columns demolished against approved plan Further demolition is in progress. Meanwhile, inaction by various teams of demolition squad, the fourth and fifth-floor partition walls and RCC balconies were demolished at Plot No. 1227, Mian Mirza Adam Khan Road, Bakrapedi, Lyari in District South and Plot No. 09, LR in Saddar area. -04, the ground floor of Lawrence Quarters and the premises up to the second floor of the building located in Lawrence Quarters compound were sealed while illegal constructions were demolished on Plot No. A-51, Sector 5-E, Scheme 41, Sarjani Town in District West. Khan and the concerned Deputy and Assistant Directors and Demolition Officers were brought into action while during this time a heavy contingent of local police including the SBCA Police Force was also present there to control the law and order situation.